Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Babcock Ranch CCSO District 5 Office
最后更新日期:2024年6月20日 Category: 县设施 当前阶段: 建设
A Master Developement Order agreement between Charlotte County and the developer has been made to build a new Law Enforcement Office located in southern Charlotte County as part of the Master Babcock Ranch Concept Plan.Sheriff District 4 HQ, Training Facility and K9 Unit
最后更新日期:2024年6月20日 Category: 县设施 类别:销售税资助 当前阶段: 建设
建设 of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport 路 Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .Lakeview/Midway Wastewater Expansion
最后更新日期:2024年6月20日 类别:公用事业 当前阶段: Planning and Project Approval
This project proposes construction of a wastewater collection system to service approximately 1,500 properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Cape Haze Wastewater Expansion
最后更新日期:2024年6月20日 类别:公用事业 类别:公用事业 当前阶段: Planning and Project Approval
This project proposes construction of a wastewater collection system to service approximately 500 properties with sewer service, new water service lines and a station that will provide sewer collection for the wastewater system.最后更新日期:2024年6月20日 类别:公用事业 当前阶段: Planning and Project Approval
This project includes extending sewer lines to provide service to certain developed properties within five project areas along the improved US 41 Corridor.
East Port Water Reclamation Facility Expansion
最后更新日期:2024年6月20日 类别:公用事业 当前阶段: 建设
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.最后更新日期:2024年6月20日 类别:公用事业 当前阶段: 建设
建设 of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.最后更新日期:2024年6月20日 Category: 县设施 当前阶段: 建设
这个12,000 square foot three-bay facility will be a state-of-the art with hurricane impact rated bi-fold doors for additional protection. The interior build-out process has started with HVAC duct work and electrical conduit installation.最后更新日期:06/17/2024 Category: 公园和娱乐 类别:销售税资助 当前阶段: Planning and Project Approval
GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and 娱乐 master Plan.